Miramar, Wellington · 2025

MIRIMAR BUS DEPOT

Precision concrete cutting and full structural demolition in one of Wellington's most recognisable transport heritage sites.

Concrete Cutting . Structural Demolition . Hazardous Material Removal . Site Clearance

PROJECT OVERVIEW

The Miramar Bus Depot presented a complex demolition challenge — a large-scale concrete structure requiring careful sequencing, precision cutting, and coordination around an active surrounding suburb.

Priority Demolition was brought in to manage the full scope: from initial structural assessment through to site clearance, delivering the project safely, on schedule, and with minimal disruption to the local area.

SCOPE OF WORKS

• Reinforced concrete slab cutting and removal

• Structural wall demolition

• Concrete core drilling

• Diamond wire sawing (if applicable)

• Hazardous material identification and removal (asbestos, lead paint, etc.)

• Debris sorting and disposal

• Site remediation and final clearance

KEY CONSTRAINTS

• Heritage-sensitive surroundings requiring careful facade management (if applicable)

• Active neighbouring properties — noise and dust controls mandatory

• Tight programme with no room for remobilisation

• [Any other site-specific challenge]

OUR APPROACH

Priority Demolition conducted a full pre-demolition survey before a single cut was made. Structural drawings were reviewed, load paths mapped, and the cutting sequence planned to ensure controlled, progressive demolition from [top-down / perimeter-in / etc.].

Diamond blade concrete cutting was used throughout for precision — keeping vibration low and giving clean, predictable break lines. All concrete waste was sorted on-site for recycling, reducing landfill and keeping the project environmentally responsible.